"Camino Rojo" Mine Diversion Channel

Warehouses

3 Months (Feb. 2022 – Apr. 2022).

Construction of the “Mina Camino Rojo” Diversion Channel

  • San Tiburcio, Zacatecas.
  • Construction of:
    • Concrete (1,900 m3).
  • 3 Months (Feb. 2022 – Apr. 2022).