Truck Shop "Camino Rojo" Mine
Mining
10 Months (Feb. 2021 –Dec. 2021)
Construction of Maintenance Building for Vehicles and Heavy Machinery.
- San Tiburcio, Zacatecas.
- Construction of:
- Special Concrete Slabs.
- Steel Structure.
- Finishes.
- 10 Months (Feb. 2021 – Dec. 2021).